WATER TRANSMISSION FROM GOLNAB-DARE SPRING

Description : Design & Engineering for supply of water to zirab & shirgah & several villages of Shahr-Kord center of chahar.Major feature of the project consists of :
400-mm diameter steel pipeline with total length of 35-km to transmit 190 L/s water from Golnab-Dare spring
underground intake structure of Golnab-Dare spring
concrete pressure reducing & storage reservoir with total capacity of 8000 m3
service road & other dependent structure
Location : Mazandaran province-Savad Koh county
Aims : Supply of water to Zirab & Shirgah cities & Several villages
Client : Iranian Ministry of Energy - Mazandaran regional water board
Services : Detail design,prepartion of technical specifications and tender documents, selection of contractors and construction supervision
Status : Basic and detailed design and construction of water transmission pipeline has been completed
  WATER TRANSMISSION FROM GOLNAB-DARE SPRING
List of Projects
search projects :