| Description : |
Design & Engineering for supply of water to zirab & shirgah & several villages of Shahr-Kord center of chahar.Major feature of the project consists of :
400-mm diameter steel pipeline with total length of 35-km to transmit 190 L/s water from Golnab-Dare spring
underground intake structure of Golnab-Dare spring
concrete pressure reducing & storage reservoir with total capacity of 8000 m3 service road & other dependent structure |
| Location : |
Mazandaran province-Savad Koh county |
| Aims : |
Supply of water to Zirab & Shirgah cities & Several villages |
| Client : |
Iranian Ministry of Energy - Mazandaran regional water board |
| Services : |
Detail design,prepartion of technical specifications and tender documents, selection of contractors and construction supervision |
| Status : |
Basic and detailed design and construction of water transmission pipeline has been completed |
|
| List of Projects |
|
|